A flow clinic for your delivery teams: give it your work items — a completed date, a
start date and a type — and it works out throughput, cycle and lead time, work in
progress, and the age of everything still open, grouped into Flow, Delivery and
Health, for one team or across all of them.
Everything you enter stays in this browser. Nothing is uploaded — there is no account
and no server.
Start Fresh opens Your Data, where you paste a report out of Jira or
add work items one at a time — a board kept by hand works just as well.
Load Sample Data fills every chart with four invented teams and nine
months of work items, each team named for the one thing it shows, so you can see what
the app does before typing anything of your own. The figures are made up.
Restore a Backup reads a Flow Metrics export.
Forecast Ahead is for a team that has not started. You type how fast you
think it will go and it answers the same two questions it would answer from real data —
when a scope finishes, and how much finishes by a date. It is your estimate with the
arithmetic done, not a measurement.
Agile Release Trains
Every Team, Side by Side
Press a column heading to sort by it. Press a team's name to open its dashboard.
Every row is read over the same window and as of the same date, whatever each team's
own export runs to — the Data to column says which teams are behind.
The Train at a Glance
Paste Work Items for This Team
Needs a completed date, a start date and a
work type somewhere in each row. Paste the export as it comes — the
right columns are worked out from the data and named back to you below, and anything
else is read for those and thrown away. Tabs and commas both work — so does a single
space, where it leaves a column of dates behind — and a header row
is skipped. An issue key column like DAE-1552 is picked up
if there is one, and it names the dots on the charts.
An export covering several teams goes in here too: it is split by the
project id at the front of each key — DAE-1552 goes to whichever team is set to
DAE — and the plan is shown below as you paste, before anything is written.
Items that are started but not finished belong here too: they count as work started.
A created date is optional and adds lead time.
Drag the ones you want to your bookmarks bar. Each fetches the
work finished in that window, plus everything still open. No bar? Press
Ctrl+Shift+B (⌘+Shift+B on a Mac) to show it.
Open your Jira site in another tab and click the bookmark.
Check the search it offers, press OK, then Copy when it says the items are ready.
Come back here, paste into the box below and press Load Pasted Rows.
It runs inside your Jira tab on the sign-in you already have, so there is no
password or token to give it. It only reads, and only these: key, type, status,
dates, parent key, the three work fields and the days spent in each status.
Summaries and descriptions are never fetched. The table goes to your clipboard
and nowhere else. This app still connects to nothing.
Changed a team’s project id? Drag the bookmarks again — each one
carries the list it was dragged with. Don’t want them any more? Delete the
bookmarks. Nothing else needs undoing.
Show the Bookmark’s Code
Every team’s project id
Loaded Data
Press an item to edit it, or add one by hand. A row pasted from an export
and a row typed in here are the same thing once they are saved — both go through the
same checks, and both are yours to correct.
Clean Up Old Data
Work items pile up, and years of them make every paste and every backup heavier
without telling you anything new. This drops the ones older than a cutoff you pick.
You choose how far back to keep, and see exactly what would go, before anything
is deleted.
No Data Yet
Head to the Your Data tab and paste your work items — a completed
date, a start date and a type. Add a created date too and you get lead time as
well. No Jira export to hand? Add a Work Item on that same tab asks
for the same things one item at a time, stage times included:
Created Start Date Completed Type
2015-01-02 2015-01-14 2015-01-21 Story
2015-01-09 2015-01-14 2015-01-26 Bug
2015-01-11 2015-01-21 2015-01-26 Story
Four teams and nine months of made-up
work items, so every chart has something behind it. You can delete it later.
No Features on This Team
Lead time needs a Created date — how long work takes from being
raised, not just from being started. Add a Created column to your paste, or fill
in the Created box on an item.